BSPL opts for Wrench SmartProject on 3.5 MTPA Project
BSPL opts for Wrench SmartProject on 3.5 MTPA Project

India, 11th September 2024: Baldota Steel & Power Limited (BSPL), the Baldota Group’s foray into the steel manufacturing space, has chosen to implement Wrench SmartProject EDMS on their upcoming integrated steel plant at Hospet, Karnataka. The 3.5 MTPA is envisaged with an investment of INR 18,000 Crores and will be set up in 2 Phases. Phase 1, commissioning is planned by Quarter 2 of 2026.
BSPL needed a system to manage internal project collaboration. They opted for the SmartProject Engineering Deliverable Management System which provides the required third party software integrations, including integration with their Email software Outlook, their project planning and scheduling software MS Project and Primavera respectively, and with SAP.
Said Harish Parihar, Head of Sales This is an important project for BSPL. Smooth collaboration is essential, both between project participants as well as all between all the involved software systems, and our SmartProject platform provides the secure common workspace needed to achieve this.”
BSPL is open to upgrading to the Wrench SmartProject PMIS in the future.
Related Posts
SAEL opts for Wrench SmartProject EDMS on Renewable Energy Projects
India; 21st Mar 2025: The ‘green’ Indian renewable energy company SAEL (Sustainable & Affordable Energy for Life) which specialises in solar and waste-to-energy projects, has chosen Wrench SmartProject EDMS as its engineering document management solution. …
Avant-garde Rolls Out Wrench SmartProject EDMS
India; 07th Mar 2025: Avant-Garde, one of India’s leading engineering and project management consultants for process and power industries, and an ISO 9001: 2015 organization, has chosen Wrench SmartProject EDMS as its platform for engineering…