Dubai Airport Phase 2 Expansion, Habtoor Leighton Group
Infrastructure
Owner: Department of Civil Aviation, Government of Dubai (DCA)
Project Details: Construction and fit-out of Terminal 3, Concourse 2 and a car park at Dubai International Airport. Terminal 3 is a multi-level underground area of more than 530,000 square meters. Concourse 2 which is a continuation of Terminal 3 is an underground structure, extending above ground under a metal shell to accommodate 14 remote stands and 27 aircraft stands. The total floor area of the project is 1,456,000 square meters.
Value: US $1 Billion
Location: Dubai, UAE
Our Client: Habtoor Leighton Group
Scope of Work: Design and Construction
About Habtoor Leighton Group: Habtoor Leighton Group (Presently BICC contracting) offers engineering and infrastructure services that include design, development, construction, and operation and maintenance.