Macawber Beekay
Power Systems
Project Details:
Macawber Beekay has opted to implement an engineering document management system to effectively oversee all their engineering deliverables.
Location: Noida, Uttar Pradesh, India.
Scope:
– Work Breakdown Structure (WBS) and progress tracking.
– Organizational folder layout.
– Workflow management.
– Automated transmittal process.
– Communication logs standard SSRS reports.
Benefits:
Implementing Wrench SmartProject at Macawber Beekay has provided empowered resources with an efficient and organized system for managing work and maintaining documents. The system automatically records submission and response dates for all documents, eliminating errors associated with manual entry. Automated transmittal generation reduces manual labor efforts significantly. All project-related documents are accessible online, facilitating easy access for the entire team via the Wrench Smart project. This ensures effective and timely distribution of documents and drawings to all stakeholders involved.
About Macawber Beekay:
Macawber Beekay is being part of the esteemed BSBK Group, which commenced operations in civil engineering & construction in 1918 and diversified over the years. Macawber Beekay is established in 1986, is a pioneer in providing comprehensive solutions to the power industry. Renowned for introducing Dense Phase Pneumatic Conveying technology to India, particularly for Dry Flyash transfer, Macawber Beekay specializes in Ash handling solutions for solid fuel-fired boilers up to 1000 MW.